石油和液体作业
概述
我们现有的石油 & 液体管道基础设施, 大约4,900 km (3,045 m), 连接艾伯塔省原油供应和美国.S. 伊利诺斯州、俄克拉何马州、德克萨斯州和美国的炼油市场.S. 墨西哥湾沿岸.
Keystone管道系统, 我们最大的液体管道资产, moves approximately 20 per cent of western Canadian crude oil export to key refining markets. We have strategically located storage terminals in 加拿大 and the U.S.,包括哈迪斯,AB.; Cushing OK; and Houston, TX.
We remain committed to meeting the energy needs of North Americans today, while advancing our 液体 Pipelines System for the demands of the future. 连接不断增长的加拿大和美国.S. 主要市场原油供应, leveraging existing assets and seeking new opportunities to continue to provide our customers with access to the destinations they need.
了解更多全球十大赌博靠谱平台我们的石油 & 以下是流动资产和项目.
对不起,没有结果.
黑棒连接项目
The 黑棒连接项目 is designed to provide both liquids and natural gas transportation infrastructure to support International Petroleum Corp.(IPC) Blackrod项目. TC Energy is proposing to develop and build a liquids pipeline and associated facilities from IPC’s proposed Blackrod Steam Assisted Gravity Drainage (SAGD) facility to the existing Grand Rapids Pipeline (GRP) System, 徘徊河以北约45公里, 阿尔伯塔省
了解更多生命周期结束计划-油 & 液体
了解更多 about TC Energy's federally regulated 生命周期结束 Program with the 加拿大 Energy Regulator (CER).
了解更多大急流城管道系统
The 大急流城管道系统 plays a key role in connecting producing areas of northwest Fort McMurray, 阿尔塔.到埃德蒙顿/心脏地带地区的码头.
了解更多Keystone XL
6月9日, 2021, TC Energy confirmed that after a comprehensive review of its options, 并与合作伙伴协商, 艾伯塔省政府, 它终止了Keystone XL管道项目.
了解更多港内连接工程
The 港内连接工程 connects TC Energy’s Keystone管道系统 at the existing Nederland Terminal to allow for the delivery of crude oil to facilities at the Motiva Terminal in Port Neches, 德州.
了解更多白云杉管道
The 72-kilometre (45-mile) 20-inch pipeline was designed to transport crude oil produced at the Canadian Natural Resources Limited (CNRL) Horizon oil sands facility in northeast 阿尔伯塔省 to the existing 大急流城管道系统 and on to markets in the Edmonton and Heartland areas.
了解更多